Commissioning a dock door RFID portal
Antenna placement, power settings and the read-rate checks to run before you sign it off.
Product walkthroughs, installation demos and read-rate tests — filmed on real sites, not in a studio.
Our engineers walk through the four failure modes we see most often on stalled pilots: the wrong tag for the surface, antennas planned on paper, read tests run at walking speed, and no baseline to measure against.
Filter by technology, or scan the durations — most run under fifteen minutes.
Antenna placement, power settings and the read-rate checks to run before you sign it off.
The same read test across six on-metal tags so you can see which survive a metal-dense environment.
Line-of-sight planning, mast height and what changes when the crop or racking goes up.
What a bearing looks like three weeks out, and the threshold that catches it in time.
Continuous logging through a freezer cycle, with the excursion caught and exported.
Everything in the box, plus the two accessories most people order straight after.
Tell us the environment and the assets — an engineer will come back with a specification you can deploy.
